Wind Industry Field Services

EXPERIENCE
TRUSTED
SAFETY

Wind Industry Field Services

EXPERIENCE
TRUSTED
SAFETY

About Us

Locally owned and operated, TETC offers a wide variety of services. 

Our Philosophy

We work hard to provide quality services at affordable prices. No job is too big or too small.

Pricing for Blade Decommission

Cost is per blade

1-10 Blades

$15,000 to $25,000

10-20 Blades

$12,000 to $15,000

20+ Blades

$12,000

Pricing for Blade Decommission

Cost is per blade

1-10 Blades

$15,000 to $25,000

10-20 Blades

$12,000 to $15,000

20+ Blades

$12,000

PROCEDURES FOR DECOMMISSION OF WIND TURBINE BLADES

First cut at 20 feet from the blade tip with machine mounted saw.
Remove section and stack to be loaded for disposal and or recycling.

Continue to move down in 20-foot sections
Sections to be cut down to as flat as possible or to be loaded for disposal and or recycling.

Cut 5 to 8 feet from the end of the root to remove the root and quarter it

Use a forklift or loader to flip blade on the opposite side and repeat steps 1-3

Continue cutting all sections as flat as possible to adhere to disposal or recycling facility specifications

Load sections and cut material into trucks or roll off boxes for hauling to disposal or recycling facility

Conduct a walk through of the work site to ensure all waste has been removed upon completion of cutting, demolition, and removing blades

TETC uses a saw that utilizes water to mitigate the dust created by cutting the blade. However, it has been determined that the slurry created by the water and dust can cause more harm to the immediate environment than dry cutting. The dust can be scooped or collected at the end of the project with minimal disturbance to the area.

Policies: Decommission of Wind Turbine Blades
01

TETC and its contractors will use machine mounted equipment for cutting and demolition of blades.

02

TETC and its contractors will limit the use of handheld saws and use specialized protective vests for all personnel when using any handheld cutting equipment.

03

Safety briefings will be held at the beginning of each day.

04

All proper PPE will be worn while any work is performed on site.

05

All personnel will be trained to operate any equipment used onsite. (e.g., forklift, loader, machine mounted saw, and handheld saw)

06

When using machine mounted equipment for cutting, all personnel will be required to stand back at minimum 50 feet.

07

No personnel will be permitted to operate machine mounted equipment when others are
within 50 feet.

08

No waste, scrap material, or equipment will be left after completion of the project unless otherwise approved by customer.

09

All procedures and practices while performing work onsite will be completed with the goal to limit disturbing or damaging the environment, cropland, or natural habitat.

06

When using machine mounted equipment for cutting, all personnel will be required to stand back at minimum 50 feet.

07

No personnel will be permitted to operate machine mounted equipment when others are
within 50 feet.

08

No waste, scrap material, or equipment will be left after completion of the project unless otherwise approved by customer.

09

All procedures and practices while performing work onsite will be completed with the goal to limit disturbing or damaging the environment, cropland, or natural habitat.

01

TETC and its contractors will use machine mounted equipment for cutting and demolition of blades.

02

TETC and its contractors will limit the use of handheld saws and use specialized protective vests for all personnel when using any handheld cutting equipment.

03

Safety briefings will be held at the beginning of each day.

04

All proper PPE will be worn while any work is performed on site.

05

All personnel will be trained to operate any equipment used onsite. (e.g., forklift, loader, machine mounted saw, and handheld saw)

Policies: Decommission of Wind Turbine Blades

Ready to Get Started on Your Project

Jesse Vickery-Main Contact

Bobby Vickery-Owner

jvickery@tetc-env.net

903-467-7650

bvickery@tetc-env.net

214-532-9497

We offer free estimates and site visits for bidding upon request.

All pricing will be project specific and fully customized to the scope of work.

Ready to Get Started on Your Project

Jesse Vickery-Main Contact

jvickery@tetc-env.net

903-467-7650

Bobby Vickery-Owner

bvickery@tetc-env.net

214-532-9497

We offer free estimates and site visits for bidding upon request.

All pricing will be project specific and fully customized to the scope of work.

Scroll to Top